Lightweight modern prefab warehouse construction process
2022-05-13
Light-duty modern prefabricated warehouses are more and more widely used in modern industrial production. Because some of the products produced by the factory go directly to the market, but most of the factories are in stock, which requires a special inventory of steel warehouses. In fact, the buildings of the warehouse and the factory are basically not very different, only one is used for the production workshop and the other is used for the warehouse inventory. Nowadays, the use of light modern prefabricated warehouses is becoming more and more extensive, so how to build qualified light modern prefabricated warehouses, we are going to start from the various processes of the construction process of light modern prefabricated warehouses.
① Cutting and blanking, this process is to pave the way for the formal processing of steel components. The quality of cutting has a direct impact on the next process. If the cutting is not careful, it may cause the material to become a pile of scrap iron, so before cutting Previously, it was important to strengthen the quality control of the process.
②Welding, this process is a hidden project and one of the most prone to quality problems, so it is necessary to ensure sufficient welding strength to ensure the strength of the components.
③Coating, this process is also a hidden process, which has a great impact on the service life of the prefabricated warehouse building. A good coating can keep the light modern prefabricated warehouse from rusting and corrosion for a long time, and increase the light modern prefabricated warehouse. service life.

3. Issues that should be paid attention to
technical quality
① When there is doubt about the steel, it should be sampled for re-inspection. Only when the test results meet the requirements of the national standard and the requirements of technical documents, can it be used.
②The steel ruler used for lofting must be inspected and qualified by the unit of measurement and checked with the steel ruler used in civil engineering, installation and other related aspects.
③When straightening with flame, the welding parts of steel grades Q345, Q390, 35, 45 are not allowed to be cooled by water, and must be cooled in a natural state.
④High-strength bolt holes and hole spacing must meet the requirements of the specification, which is directly related to the major problem of installation quality.
⑤ The treated friction surface should be properly protected; naturally rust, generally the rusting period should not exceed 90 days, and the friction surface should not be reused.

The above is the brief process of building a light modern prefabricated warehouse. For steel structure production and processing plants, some safety measures must be paid attention to
①Conscientiously implement the safety operation rules of various types of work.
② Take leakage protection measures for electrical equipment to prevent electric shock.
③It is strictly forbidden to overload the crane.
④When operating various types of work, you should wear labor protection articles.
【Daily maintenance and maintenance】

1. After the steel warehouse is manufactured and installed, for the owner, it is not allowed to change its structure without permission, and it is not allowed to disassemble any bolts and other components, and it is not allowed to increase or decrease the partition wall. If you need to change any parts, you must negotiate with the manufacturer. It's up to the manufacturer to decide whether it can be changed. The steel structure must be maintained with paint after about 3 years of use, so as to give the building beauty and safety. The prefabricated steel warehouse is connected by steel structural components, so electrical equipment, such as wires, should be isolated by trunking and pipes to avoid electric shock accidents.
2. The prefabricated warehouse must be cleaned and maintained regularly. Under normal circumstances, it needs to be checked and maintained once a year. When cleaning the exterior walls of prefabricated warehouse buildings, you need to be careful not to mess up. You cannot use abrasive cleaning products such as steel balls and board brushes. When using clean water, it should be washed from top to bottom. Branches, leaves and other similar objects on the warehouse should be cleaned up in time to avoid unnecessary trouble caused by the backlog. If the surface of the metal plate of the warehouse is damaged, it should be repaired in time to prevent the sun and rain from corroding the metal plate surface. If necessary, use all high-elastic nanomaterials to protect the metal roof panel, and play an effective role in heat insulation and waterproofing, saving indoor air conditioning energy.
The maintenance and maintenance of the cost of the prefabricated warehouse has a great relationship with the service life of the steel structure. Therefore, the owner pays enough attention to it. If you encounter any problems in maintenance and maintenance, you should contact professional steel structure manufacturers for help.
Dongguan Hongye Steel Structure Co., Ltd. has rich experience in engineering cases and has specialized in exporting for 15 years. If you have any needs, you can contact us, email: lee@hy-steel.cn, phone: 0086-15322877859
?
1. Prefabricated warehouse design:
Design is the source of all processes. Reasonable design can make construction more efficient. Only with a design plan can the construction personnel install and build according to the design drawings of the steel warehouse, otherwise it will be headless flies.
2. Warehouse material production:
The production is to process the steel components according to the designed plan, which is divided into the following steps.① Cutting and blanking, this process is to pave the way for the formal processing of steel components. The quality of cutting has a direct impact on the next process. If the cutting is not careful, it may cause the material to become a pile of scrap iron, so before cutting Previously, it was important to strengthen the quality control of the process.
②Welding, this process is a hidden project and one of the most prone to quality problems, so it is necessary to ensure sufficient welding strength to ensure the strength of the components.
③Coating, this process is also a hidden process, which has a great impact on the service life of the prefabricated warehouse building. A good coating can keep the light modern prefabricated warehouse from rusting and corrosion for a long time, and increase the light modern prefabricated warehouse. service life.

3. Issues that should be paid attention to
technical quality
① When there is doubt about the steel, it should be sampled for re-inspection. Only when the test results meet the requirements of the national standard and the requirements of technical documents, can it be used.
②The steel ruler used for lofting must be inspected and qualified by the unit of measurement and checked with the steel ruler used in civil engineering, installation and other related aspects.
③When straightening with flame, the welding parts of steel grades Q345, Q390, 35, 45 are not allowed to be cooled by water, and must be cooled in a natural state.
④High-strength bolt holes and hole spacing must meet the requirements of the specification, which is directly related to the major problem of installation quality.
⑤ The treated friction surface should be properly protected; naturally rust, generally the rusting period should not exceed 90 days, and the friction surface should not be reused.

4. On-site installation:
This process occupies an important position in the quality of the project, and its quality is greatly affected by the previous process, and also has a greater impact on the entire light-duty modern prefabricated warehouse. In reality, some enterprises do not strictly follow the national design standards and prescribed construction specifications, and ignore the details and precautions in the construction of light-duty modern prefabricated warehouses, resulting in safety problems in light-duty modern prefabricated warehouses, and even posing a threat to life and property. Handle every process and every detail well to ensure the quality of the steel structure project. Hengguang Company adheres to the principle of conscientious engineering, rest assured engineering, and peace of mind engineering, strictly controls each process, ensures the quality of steel structure engineering, and strives to be the best steel structure engineering in China.
The above is the brief process of building a light modern prefabricated warehouse. For steel structure production and processing plants, some safety measures must be paid attention to
①Conscientiously implement the safety operation rules of various types of work.
② Take leakage protection measures for electrical equipment to prevent electric shock.
③It is strictly forbidden to overload the crane.
④When operating various types of work, you should wear labor protection articles.
【Daily maintenance and maintenance】

1. After the steel warehouse is manufactured and installed, for the owner, it is not allowed to change its structure without permission, and it is not allowed to disassemble any bolts and other components, and it is not allowed to increase or decrease the partition wall. If you need to change any parts, you must negotiate with the manufacturer. It's up to the manufacturer to decide whether it can be changed. The steel structure must be maintained with paint after about 3 years of use, so as to give the building beauty and safety. The prefabricated steel warehouse is connected by steel structural components, so electrical equipment, such as wires, should be isolated by trunking and pipes to avoid electric shock accidents.
2. The prefabricated warehouse must be cleaned and maintained regularly. Under normal circumstances, it needs to be checked and maintained once a year. When cleaning the exterior walls of prefabricated warehouse buildings, you need to be careful not to mess up. You cannot use abrasive cleaning products such as steel balls and board brushes. When using clean water, it should be washed from top to bottom. Branches, leaves and other similar objects on the warehouse should be cleaned up in time to avoid unnecessary trouble caused by the backlog. If the surface of the metal plate of the warehouse is damaged, it should be repaired in time to prevent the sun and rain from corroding the metal plate surface. If necessary, use all high-elastic nanomaterials to protect the metal roof panel, and play an effective role in heat insulation and waterproofing, saving indoor air conditioning energy.
The maintenance and maintenance of the cost of the prefabricated warehouse has a great relationship with the service life of the steel structure. Therefore, the owner pays enough attention to it. If you encounter any problems in maintenance and maintenance, you should contact professional steel structure manufacturers for help.
Dongguan Hongye Steel Structure Co., Ltd. has rich experience in engineering cases and has specialized in exporting for 15 years. If you have any needs, you can contact us, email: lee@hy-steel.cn, phone: 0086-15322877859
?
Related News
Advantages of building with steel structure warehouse
2022-04-20 782We specialize in steel structure building solutions manufacturer
2022-04-12 446The Project of Steel Structure in Middle East Saudi
2022-03-10 5487 Incredible Precision Steel Warehouse Closing Applications in 2022
2022-03-10 512